Risk-based management of the bridge stock

In the past, the Technical Committee 4.3 Road bridges reviewed the bridge management systems implemented in several countries and advised a revision of the management of bridges based on risks (Management of bridge stock 2011 - report ISBN 2-84060-238-5).

This report aims to provide some answers with respect to risk-based management for bridges.

It discusses the integration of risk-based analyses into the bridge management systems of several countries and gives examples of formal methods of risk-based analyses on certain types of structures (pre-stressed concrete bridges, barriers, wind barriers) or hazards (earthquake, wind, scour, climate change).

  • Date : 2016
  • Author(s) : Comité technique 4.3 - Ponts routiers Technical Committee 4.3 - Road Bridges
  • Domain(s) : Risk Management / Road Bridges
  • PIARC Ref. : 2016R05EN
  • ISBN : 978-2-84060-381-8
  • Number of pages : 39

This site uses cookies to optimize its operations. By clicking on the "Continue" button, you agree to browse our website without changing your cookies settings, you accept their use. Learn more and set up cookies.