PIARC (World Road Association), founded in 1909 and comprising 125 member governments from all over the world, is the global forum for exchange of knowledge and experience on roads, road transport policies and practices. With consultative status to the Economic and Social Council of the United Nations, the Association is contributing to a stable and sustainable global development of the road and transport sector.

This site uses cookies to optimize its operation. They allow you to securely access your personal space and download our publications. You accept their use by clicking on the "Accept" button.

Investigating Unpredicted Infrastructure Failure

This report is an outcome of PIARC mechanism for Special Projects, which is PIARC instrument to respond quickly to emerging issues for PIARC member countries.

This report provides a review of 15 Unpredicted Infrastructure Failure (UIF) case studies that have been collated from around the world. For the purposes of the report UIF is defined as:

instances where failure1 occurs on an asset that is considered in good condition and is well maintained

The case study data from our interviews and online surveys have been assessed to identify lessons that can be utilised by road administrators when preparing for, responding to and recovering from UIF. Our results and conclusions have been categorised against the incident management cycle which is made up of four key stages; Mitigation, Preparedness, Response and Recovery.

The report has identified that UIF events due to their unpredictable nature should be considered as part of any preparedness arrangements for key road assets. Conclusions have centred around lessons that can be adopted for asset management and inspection, incident preparedness arrangements, the importance of internal and external communications when managing UIF and the impacts for recovery when UIF affects key road assets.

N.B. Failure for UIF can be defined as a closure or collapse of an asset that leads to loss of service, such as a closure of a bridge.

Information sheet

  • Date: 2018
  • Author(s): Rednoa
  • Domain(s): Risk Management / Road Network Operations / Road Bridges
  • Type: 2018SP01ENJ - Special Project
  • PIARC Ref.: 2018SP01
  • Number of pages: 51